Recent Projects

Production Line Installation And Custom Rigging Services For A Beverage Packaging Plant

Boulter has extensive experience rebuilding and installing production lines for a variety of industries. When a local beverage packaging plant reached out to us to assemble and install a multi-line production system, the first step for our crew was to prepare the site by removing the old line using electric forklifts, portable jacks, and skates. With the area prepared, our crew began the conveyor system assembly and installation based on the provided drawings. The client was pleased with our efficient and effective services and the updates to the system increased overall plant production.

Project Highlights

Capabilities Applied & Processes Implemented

  • Rigging
    • Removal of the old production line
  • Production line installation
  • Fabrication and installation of steel connectors

Equipment Used for Installation

  • Electric forklifts
  • Manlifts
  • Skates
  • Portable jack
  • Rigging gang box