At Boulter, we understand the importance of safe and efficient tank installations. When a local client sought out our custom rigging services for a 37,000-pound beverage tank, we brought in a range of specialized equipment. With the use of our FR Series 40/60 fork truck, portable jacks, shims, and skates we were able to successfully complete the job with little disruption to operations.
Project Highlights
Capabilities Applied & Processes Implemented
- Rigging
- Transported the tank into the building using our 40/60 Hoist forklift and skates
- Installation
- Tank installation completed by four Boulter field employees
- Equipment leveling and alignment using shims
- Anchoring equipment to the concrete floor
Estimated Weight
- 37,000 pounds
Equipment Used for Installation
- 2.5-ton fork truck
- 40/60 Hoist fork truck (Lifting capacity up to 60,000 pounds)
- Portable jack
- Shims
- Rigging gang box