Media

Rigging the Boulter Way

There is a certain finesse required to complete a rigging job in the highest quality possible.  Manufacturing machines aren’t simple moves either: they’re bulky and oddly-shaped.  But those large, heavy machines are a huge investment to our clients; therefore, we take extra precautions to make sure the job is done correctly and with the highest caliber work possible.

To give you a better idea of what’s involved, one of yesterday’s rigging jobs called for two forklifts and one crane to unload and move a 30,000-pound machine.  After lifting the crate off the truck bed, our employees went to work disassembling the crate and unpacking the cargo.job 8.5

20150805_113312

Then they used the Hyster 15-Ton to move it closer to the crane for offloading from the skid.

Finally, all that was left was to move it into the shop.20150805_113717

Does your company have something impossibly heavy to move? Give us a call… we make the impossible possible! 

Visit our website: www.boulter1.com